Performance evaluation of a fixed element crystalliser

During the 2012 and 2013 non-crush seasons, two horizontal crystallisers were replaced at Victoria Mill. Victoria Mill currently has six operational horizontal crystallisers, of which four are fixed element design (FED). Two of these were installed leading up to the...

Upgrade of the crystalliser station at Tully Mill

Tully Mill has six low-grade crystallisers that are divided into two parallel sets, each with three units operating in series. The paper describes modifications made prior to the 2002 crushing season, in which two crystallisers in one of the sets were modified to...