The track occupation problem within cane railways

More than locomotives occupy cane railways. In addition to the locomotives that are completing their runs, bins can also be stored temporarily on the track and various other items, including maintenance equipment, can occupy sections of the network. This paper first...

Real-time cane transport scheduling

Real-time scheduling addresses the operational (as opposed to the planning) scheduling problem. The most significant difference between operational and planning scheduling is that operational scheduling must handle disruptions to the system, such as mill and harvester...

A web-based siding booking system

A siding booking system has been developed to allocate cane railway sidings to harvesting contractors. The system was developed over several years and Proserpine Sugar Mill has been using this system since 2001. The siding booking system is a web application and...