This paper reviews the cracking of the pre-stressed concrete girders on BL Creek bridge in the Racecourse Mill area. The bridge is a curved, four-span (each 12 m long) bridge built in 1982 to service an area that now delivers 30 000 to 35 000 tonnes of cane from six...