Groundwater levels in the Burdekin Haughton Water Supply Scheme area (BHWSS) have been consistently rising at about 500 mm/annum, since the development of 40 000 ha of additional irrigation land within the Burdekin River Irrigation Area (BRIA). During 2007 Davco...
This paper reports on two changes to the ‘normal’ farming system in the Burdekin in which placement of fertiliser differs from common practice in plant cane. One placement method involves the surface application of a ‘non-mobile’ fertiliser...
Numerous recent investigations/reports have identified agricultural production as a source of potential environmental problems for the GBR. The Productivity Commission reported that ‘soil erosion and runoff of fertilisers and chemicals pose a significant threat...