The designs of the wet scrubbers after bagasse-fired boilers are reviewed, considering the necessary input from the boiler original equipment manufacturer (OEM), as well as the requirements of the end users. In addition, the impact on boiler off-gas with or without...
Design experience in gas-cleaning equipment between the boiler, air heater and economiser is highlighted. Having multicyclones fitted into the horizontal ducting before the air heater and economiser is extremely important to protect both from erosion and build-up and...