Asset management and electronic consignment

In the Herbert River district, around 8000 bins each day of the crushing are assigned via a paper-based system to the cane block from which they were harvested. The Herbert has 20 000 cane blocks. About 3000 errors occur each year during this consignment process,...

Sugarcane yield monitoring in the Herbert district

Sugarcane yield mapping began in the Herbert District in the 1998 crushing season. A prototype cane yield monitor was developed and field tested, and produced yield maps of the harvested areas. Interest in cane yield monitoring systems was regenerated in the region...