Computational dynamic analysis of a fugal floor structure

Sucrogen Victoria Mill is at the mid-point of a high-grade fugal replacement strategy. Installation of a second Titan 1900 fugal was completed in the 2011 maintenance season. Installing this machine required the fabrication of a new section of elevated, structural...